We calculate the air exchange by room use, draw the duct layout, choose the heat recovery unit and prepare the documents for building handover.
An A++ house must be very airtight: the n50 value measured in an airtightness test must not exceed 0.6 1/h. Air hardly passes through such walls and windows, so without mechanical ventilation moisture and carbon dioxide build up and windows fog up.
If you ventilated by opening windows, the heat would leave with the air. That is why the A++ class is practically impossible to reach without ventilation with heat recovery. The building regulation also sets a minimum heat recovery efficiency and maximum fan power for the unit, so we choose a unit that meets these requirements.
For each room by its use: how much air to supply to the bedrooms and living room, how much to extract from the bathroom, kitchen and WC.
Duct runs, distribution boxes, diffuser positions and silencers, coordinated with the ceiling and floor construction.
Unit capacity with a margin, the type of heat exchanger and a location where it is easy to service.
The documents needed for building handover.
Ideally while the walls are going up and the ceilings are still open. Then we plan the shortest duct runs, lay the ducts before insulation or floor screed, and reserve a place for the unit in advance. For the design we need floor plans with dimensions and information about the ceiling construction.
When we prepare the design ourselves, we install to it and measure the airflow at every point with an anemometer. At handover you have a system that works as designed. Installation prices – heat recovery prices page.
We price the design by floor area and drawings. Send them through the request form – PDF or DWG will do.
A fan is fitted into a door and creates a 50 Pa pressure difference between inside and outside. The test measures how many times per hour the air would be replaced – that is the n50 value. For an A++ house it must be no more than 0.6.
Yes. The unit returns most of the heat that would otherwise leave with the ventilation air. Without it the A++ class is practically impossible to reach.
Floor plans with dimensions, a section and information about the ceiling construction. If you already know where the boiler room or utility room will be, mark it on the plan.
Yes. We run the ducts through the attic, wardrobes or suspended ceilings. More on the heat recovery installation page.
We will tell you the design price and timeline. We reply to requests on the same working day.